Cantilevered Folded Steel Staircase

Working in close collaboration with Structural Engineers MHA and fabricators Weber Industries our cantilevered and folded mild steel staircase, forming the primary circulation space to our mixed-use refurbishment and extension on Hampstead High Street in north London is now in production and beginning to take shape.

Helical Geometries

The generous floor to ceiling heights and challenging spatial constraints presented by the existing conditions called for us to adopt helical stair geometries and steel construction to make the most efficient use of the space available. By doing so, it also offered the opportunity to create an inspiring entrance sequence and circulation space for its prospective users.

As always here at Patalab, diverse ranges of design tools were adopted throughout the development of the folded steel staircase: from hand drawn sketches to complex 3D CAD modelling. Whilst respecting the fabrication constraints, this allowed for refinement of the structural dimensions to echo the proportions used elsewhere and subtly carry a theme throughout the project.

Woven into the Building’s Structure

The solid balustrade from entrance level elegantly transitions into an open one at first floor level, gradually demarcating the change of occupancy as one ascends from office use to residential on the upper two floors. An acoustically separated steel frame concealed within the surrounding wall structure supports the folded steel treads, whilst the open steel rod balustrade contributes to the load transfer and minimising of deflection.

Wax polish will protect the steel whilst ensuring the fabrication workings and raw material qualities of the mild steel remain expressed and celebrated. The stair will be finished with timber infills to the treads, raw stucco plaster to the upper wall level and complementing Linoleum at lower wall level.

Hendon House Extension Receives Planning Permission

Patalab Architects have recently secured Planning Permission from Barnet Council for an ambitious basement and…

17/09/2023

Marylebone Mews House retrofit features in Architects’ Journal

We have successfully completed the renovation of Marylebone Mews House, a remarkable example of a…

05/08/2023

Lake House Augustabad Receives Planning Permission

Lake House Augustabad, situated on the shores of Lake Tollensesee in Neubrandenburg, Germany, has recently…

09/07/2023

Talk at University of Innsbruck

Michael, Director of Patalab's Berlin studio, is giving a lecture at the University of Liechtenstein…

18/06/2023

Marylebone Mews House Completed After Extensive Renovation

We have successfully completed the renovation of Marylebone Mews House, a remarkable example of a…

06/06/2023

Good Work Standard Employer

We are thrilled to announce that our team has been selected as one of the…

04/06/2023